BIM thinking ahead – Comes the Fiery Night
I decided to challenge myself and explore existing and emerging technologies in order to estimate what could we achieve during the next 30 years. The… Read More »BIM thinking ahead – Comes the Fiery Night
I decided to challenge myself and explore existing and emerging technologies in order to estimate what could we achieve during the next 30 years. The… Read More »BIM thinking ahead – Comes the Fiery Night
UK BIM Framework roadmap! Almost three years have passed since the first BS EN ISO19650-1 standard was published.A lot of work has been done; some… Read More »UK BIM Framework
Workflow comparison My research shows that BS EN ISO 19650 Part 2 (delivery) and Part 3 (operation) have 74.24% similarity. To put it another way, both… Read More »BS EN ISO 19650 Part 2 vs Part 3
The field ‘Role’ has been renamed ‘Discipline’ in the most recent edition of BS EN ISO-2 19650-2:2018 NA February 2021. The previously used role codes,… Read More »UK National Annex 2021 Discipline vs Role
BS EN ISO 19650-2 2018, NA 02/2021 Status Code Suitability Action by Information State (at any project stage): Work in progress (WIP) S0 Information developed… Read More »BS EN ISO 19650-2 UK National Annex (NA) 2021 status and suitability reference table
BS EN ISO 19650-2 2018 BS EN ISO 19650-2 2018, NA 02/2021 Status Code Suitability Action by Suitability Action by Information State… Read More »Comparison of status codes between UK National Annex (NA) 2018 vs UK NA 2021
Introduction It can be said that the digitalization of construction began with designers moving from drawing boards to computers. [1] In Architecture, Engineering, Construction and… Read More »How to respond to request for proposal (RFP)
Introduction The COVID19 pandemic has impacted global health and the economy. This report explores the shift in Building Information Modelling (BIM) and associated technology, its… Read More »Post-COVID 19 pandemic Architecture Engineering and Construction (AEC) Industry
Introduction The term referred to as Lean Construction aims to reduce overproduction, minimise handling, storage, transportation, or remove processes that do not add value. The… Read More »BIM and Lean Construction
The use of terms such as Lead Appointed Party, Appointed Party and Task Team in lieu of terms: employer, supplier, contractor and subcontractor, require clarification… Read More »Terminology and UK Contract Law