PAS 1192-7
The latest message related to PAS 1192-7 is a tweet from Paul Surin is that PAS1192-7 confirming that CPNI and BSI have agreed to cease… Read More »PAS 1192-7
The latest message related to PAS 1192-7 is a tweet from Paul Surin is that PAS1192-7 confirming that CPNI and BSI have agreed to cease… Read More »PAS 1192-7
The Master Information Delivery Plan (MIDP) is the primary plan for the preparation of project information (from the supplier’s perspective), which is set out as… Read More »Master Information Delivery Plan (MIDP)
The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists… Read More »Project Implementation Plan (PIP)
individual or multiple buildings (e.g. a site or campus) or infrastructure (e.g. roads, railways, pipelines, dams, docks, etc.) built as part of a construction project… Read More »built asset
schedule of information containers and delivery dates, for a specific task team [cited from ISO 19650-2:2018(en), 3.1.3.4] The Task Information Delivery Plan (TIDP) is defined… Read More »Task Information Delivery Plan (TIDP)
a term defined by BS 1192:2007 means a spatial subdivision of a project to allow multiple people to work on Project Information Model simultaneously, i.e.… Read More »volume
In the construction industry, Tier 3 is a sub-contractor referred in ISO 19650 as the Appointed party and Task Team, with a sub-contract who provide… Read More »Tier 3
In the construction industry, Tier 2 is a Contractor referred in ISO 19650 as the Appointed party with a sub-contract who provide goods or services… Read More »Tier 2
It is a term introduced in PAS 1192‑2: 2013 and ISO 19650 set of standards. It means any graphical or non-graphical information such as: Structured… Read More »Project information model (PIM)
The Publicly Available Specification (PAS) 1192 part two was published in February 2013; the specification was based on existing Code of practice BS 1192 dated… Read More »PAS1192-2_2015