A message is received from a participant, which initiates the process. The actual recipient of the message can be identified by connecting the event to a participant via a message flow within the process’s definitional collaboration.1]
[1] Silver, B. (2009). BPMN Method and Style: A levels-based methodology for BPM process modeling and improvement using BPMN 2.0. In CodyCassidy Press US.
Tags: #Architecture, #BIMheroes, #BIMmandate, #BuildBackBetter, #DigitalTransformation, #Engineering, #InformationManagement, #Innovation, #ISO19650, #leanBIM, #tbim2021, #UKBIMFramework, AEC, BIM, BPMN, ConstructingPlainLanguage, Construction
Asset Lifecycle:
RIBA Plan of Work 2020: