Pre-contract BEP
- by Jarek Wityk
« Back to Dictionary Index
Asset Lifecycle
RIBA Plan of Work 2020
« Back to Dictionary IndexRelated Posts
Post-COVID 19 pandemic Architecture Engineering and Construction (AEC) Industry
Introduction The COVID19 pandemic has impacted global health and the economy. This report explores the shift in Building Information Modelling (BIM) and associated technology, its… Read More »Post-COVID 19 pandemic Architecture Engineering and Construction (AEC) Industry
BIM and Lean Construction
Introduction The term referred to as Lean Construction aims to reduce overproduction, minimise handling, storage, transportation, or remove processes that do not add value. The… Read More »BIM and Lean Construction