Skip to content

Gateway (Inclusive) (OR)

[Or] When a branch splits, one or more branches are activated. Before merging, all active incoming branches must be completed.[1]

Symbol

1]     Silver, B. (2009). BPMN Method and Style: A levels-based methodology for BPM process modeling and improvement using BPMN 2.0. In CodyCassidy Press US.

  • Rating:
Categories: BPMN, ISO 29481
Asset Lifecycle:
RIBA Plan of Work 2020:

Leave a Reply