Construction Manager at Risk

Various key characteristics of CM@Risk include:

  • there are separate contracts for design services and for construction services;
  • the contract for construction services may be entered into at the same time as the contract for design services, or at a later time;
  • design and construction of the project may be in sequential phases or concurrent phases; and
  • The services of finance, maintenance, operations, pre-construction, and other related services may be included1.